As you can see, despite best efforts, I have managed to get quite a bit of paint onto my blue trim, so the next job is to go back and touch up the blue and green paintwork.
Monday, 24 March 2008
Roof colour
As you can see, despite best efforts, I have managed to get quite a bit of paint onto my blue trim, so the next job is to go back and touch up the blue and green paintwork.
Friday, 14 March 2008
Shingling finished, now deciding roof colour
The shingling is finished, and I could finally sweep away the kazillion little bits of shingle and splinters and sawdust littering my work area. It looks like a house now, and I feel like the end is in sight, even though there is still loads to do.
I have about three-quarters of a sheet of shingles left, even after wasting about a sheet on my false start, so there are plenty of shingles in the kit. In fact, I also found some more clapboard in my box which I had thought was shingle, so I had more clapboard left over than I thought also.
Now I have to decide what colour to paint the roof. I've put on a starting coat of Anita's Rust Red but I don't want this to be the final colour, it is too orangey and too much like the foundation. I'm not sure whether I want to go darker, or lighter. I've taken the left over shingles and mocked up a bit of 'shingled roof' on a scrap bit of MDF board, and I will try out a few paint possibilities on that. I want something that will look realistic, but also contrast with the blue and green colours. I am tempted to pick out the fishscale shingles in a different colour, but I did read that that wouldn't be historically accurate. I might do it anyway.
Sunday, 2 March 2008
Right mansard roof shingled
Friday, 22 February 2008
Top roof shingling done, and main roof fascia
Saturday, 9 February 2008
Shingling
Friday, 1 February 2008
I finally finished the clapboard!
Wednesday, 23 January 2008
Mochas Mom - question re hinging
Thank you! I love this house, it is such an attractive design. Because I have converted the house to be a shop (store), I actually only have two hinged doors. There is the main front door, which is a commercially purchased set of French doors with the grille removed, so it comes already hinged. The other is the bathroom door. Because the kit door is so thick, and got even thicker when I applied coffee stirrers to give a panelled effect, I hinged the bathroom door with the pin method. I drilled a small hole at the top and bottom, near the corner, and glued in a sewing pin, then cut the sewing pin down to about 1/4 inch. You need to round off the hinge edge of the door for this to work, so it will open smoothly. Then I drilled a corresponding hole in the floor for the bottom pin to fit into, and a slot into the top of the door frame (hidden by the door moulding) for the top pin to fit into. To mount the door, I just pushed the bottom pin into the floor hole, then stood the door up so the top pin went into the slot. Then I glued on the door moulding to hide the slot. The door pivots on the pins. If you didn't round off the hinge side of the door, then the corners of the door would bind and it wouldn't pivot properly. They do make small brass hinges but I felt it would be too difficult to try to attach them.